Operational Process

From request to report delivery, each stage is designed to maintain the continuity of your facilities.

1. Ticket Registration

The customer enters the request through the B2B portal, indicating the type of service, urgency, and exact location of the equipment or area.

2. Technical Assignment

The system assigns the case to the specialized technician according to the category: electrical, HVAC, or industrial cleaning.

3. On-site Diagnosis

The technician performs a visual inspection and measurements with calibrated tools to identify the root cause of the failure.

4. Service Execution

The approved corrective or preventive maintenance plan is applied, using certified spare parts and materials.

5. Verification and Testing

System operation is checked, electrical and thermal parameters are measured, and compliance is recorded.

6. Closure and Report

A digital report is delivered with the actions taken, time spent, and recommendations for future interventions.

Comprehensive Corporate Maintenance Management

Functions designed to optimize the operation of buildings and industrial plants in Argentina.

Scheduled Electrical Maintenance

Thermographic inspection of panels, load analysis, and planned replacement of critical components to prevent unexpected outages in office towers.

Electricity · Failure reduction

Efficient Industrial HVAC

HVAC systems with heat recovery and zone control for factory buildings, maintaining stable conditions in production plants with high thermal demand.

HVAC · Energy savings

Deep Surface Cleaning

Disinfection protocols with quaternary ammonium compounds and cryogenic cleaning of air ducts, applied in corporate buildings without interrupting work activities.

Sanitization · Regulatory compliance

Service Ticket Management

B2B platform to register corrective maintenance requests, assign technicians, and track each intervention in real time.

Software · Operational traceability

Preventive Maintenance Schedules

Customized calendars per equipment and building, with automatic alerts and compliance reports to plan resources without surprises.

Planning · Asset control

Downloadable Operational Reports

Technical reports with consumption data, failure history, and efficiency metrics, available in PDF format for audits and decision-making.

Documentation · Transparency

Results that support our service

Clients from corporate buildings and industrial plants share their experience with our maintenance plans.

5

“We reduced unscheduled HVAC downtime by 40% thanks to Avyaservices' preventive plan. The technical team responds in less than two hours.”

Eng. Elizabeth Alarcón Head of Infrastructure, Buenos Aires Corporate Tower
4

“The ticket system allows us to track each electrical intervention. Now we have clear monthly reports and internal audits.”

Juan Manuel Cavazos Segundo Maintenance Coordinator, Córdoba Industrial Plant
5

“Post-pandemic industrial cleaning remains impeccable. The protocols were adjusted to our routines without interrupting operations.”

Dr. Abril Leiva Segundo Facility Management Manager, Rosario Corporate Building
4

“The preventive maintenance schedule helped us plan line shutdowns without affecting production. Very professional.”

Cookie settings

We use cookies to keep the site stable, remember basic preferences, and understand which pages are useful. You can accept, reject, or review the settings before continuing.

ES EN